The number of public sector homes built in the last three years has been revealed.
Douglas South MHK Claire Christian asked Infrastructure Minister Tim Crookall via a Tynwald written question how many new social houses were built from October 2021 to September 2024.
Mr Crookall replied that 96 dwellings were built from 2021-22, 58 built between 2022-23, and 11 from last year to 2024.
The Minister added that the overall total includes the new additional dwellings and replacement dwellings.
Little time left to swap over manx.net emails
What do you think of the Post Office?
£1.3m computer system could improve courts
Cultural organisation says income has dropped
Students can win trip to NASA space school
Unknown substance on beach likely palm oil
Yellow weather warning for ice
Emergency services dealing with ‘unknown substance’ on beach